NEA – Reporters Nepal https://nepalireporter.com Impart Educate Propel Wed, 23 Jan 2013 16:43:44 +0000 en-US hourly 1 https://wordpress.org/?v=6.2.6 https://nepalireporter.com/wp-content/uploads/2023/01/cropped-RN_Logo-32x32.png NEA – Reporters Nepal https://nepalireporter.com 32 32 Loadshedding hours reduced ‘unofficially’ https://nepalireporter.com/2013/01/5008 https://nepalireporter.com/2013/01/5008#respond Wed, 23 Jan 2013 13:27:57 +0000 http://nepalireporter.com/?p=5008 KATHMANDU: The Nepal Electricity Authority (NEA) has reduced the load-shedding hours unofficially from today onwards, just a day after the Prime Minister tweeted in the social media Tweeter.

Before this, the NEA had increased the load-shedding hours to 97 a week effective from January 19. The period of power outage before this was 84 hours a week since December 26, 2012.

Chief of the power dispatch centre at NEA, Bhuwan Kumar Chhetri, said that the load-shedding hours have been reduced on a trial basis without issuing the load-shedding schedule after the supply of 25 Megawatt power from India was resumed.

 

]]>
https://nepalireporter.com/2013/01/5008/feed 0