Minister Lekhak pledges construction of dry port in Kanchanpur
Bhimduttanagar, Aug 30: Minister for Physical Infrastructure and Transport Ramesh Lekhak pledged to begin works for the construction of a dry port (proposed) at Dodhara Chandani of Kanchanpur.
Inaugurating today the four-room building of Sharada Saraswoti Higher Secondary School based in Dodhara Chandani, Minister Lekhak vowed to work out on the dry port construction project.
The Ministry was working out on a project to construct a four-lane cemented bridge over the Mahakali River, he said, assuring of the commencement of other projects of physical infrastructure in the district.
The school building was constructed at a cost of Rs 900,000. Of the construction cost, Rs 750,000 was released through the Parliament Development Fund. RSS